
New lift installs
From the enquiry and drawings, through the factory order and haulage, to the install and the handover paperwork. It speaks up before a job moves on with a deposit unpaid or a RAMS missing.
- Stages from the enquiry through to the paperwork and handover
- Proposals built from the job, sent and filed as revisions
- A final invoice that can't be raised before the job gets there
- Factory order, lead time, due date, then haulage booked, collected and delivered
- Site survey and pre-install visit forms from the engineers
- Install test and commissioning sheet, signed on site
Enquiry Drawings Proposal Deposit Factory order Haulage Install Handover






